Amandantie 2
IVAeris Oy completed the installation of a mechanical supply and exhaust ventilation system at a care home in Kirkkonummi.
Asennus
LVI-J. Kaisto Oy
Kirkkonummi
2019
We pulled off a top-tier ventilation system installation at a care home on Amandantie, Kirkkonummi. Here’s how IVAeris Oy crushed it with the help of LVI-J. Kaisto Oy:
First, we did a deep dive into the existing ductwork, which had some missteps—some ducts were installed backward in the attic. So, we kicked off the project by correcting these errors.
Next, we marked all duct locations on the machinery room wall, ensuring the construction team could drill the necessary holes. This step was crucial to ensure the entire ventilation system would operate seamlessly and efficiently.
We didn’t need to deal with ductwork in the machinery room itself, which saved time and resources. Instead, our focus was on verifying that all required materials were on site. Whenever we identified any shortages or additional needs, we communicated it immediately to LVI-J. Kaisto Oy.
The collaboration with LVI-J. Kaisto Oy was smooth, and communication was spot-on. The end result? A fully functional ventilation system that boosts air quality and energy efficiency in the care home. We executed everything with minimal disruption to the care home’s operations—because we know how important it is to keep things running smoothly.